Starting November 16, 2026, a major roadworks project will reshape traffic on the west side of Paris. Here’s what you need to know before your next trip to Versailles.
What’s changing
The North tube of the Saint-Cloud tunnel, on the A13 motorway, will close in the Paris → province direction — exactly the direction of your trip to Versailles. The closure, decided by DiRIF (the Île-de-France roads authority), is needed to reinforce the tunnel’s structure, built nearly a century ago, ahead of the Grand Paris Express Line 15 tunnel boring works.
The closure will run from November 16, 2026 to the end of August 2027, roughly nine months.
Good news: your return trip is unaffected
The South tube, serving the province → Paris direction, stays open throughout the works. In practice, your outbound trip to Versailles may follow a detour route, while your return to Paris runs normally.
Planned detour routes
Two main alternative routes will bypass the closed tunnel:
- Via RD910 then RN118
- Via RN13 then A14
These alternatives may add to travel time, particularly during peak hours.
Our commitment during this period
At CRÉNOLIA, we closely monitor the works and real-time traffic guidance. Our drivers adjust their route based on current conditions and plan ahead to guarantee punctuality, whichever path the trip takes.
Most importantly: your price stays the same. The fixed rate for your Paris ↔ Versailles transfer does not change, regardless of the actual travel time caused by the roadworks.
If you’re planning a visit to the Palace of Versailles between November 2026 and August 2027, we recommend booking with a little extra time margin, especially in the late afternoon.
Source: Direction des routes d’Île-de-France (DiRIF)

Add Your Comment